Hi, How Can We Help You?

Gass Plant Unit

Gass Plant Unit

Generation

Gas Power Generation unit comprising of three GE Jenbacher Engines was set up at the end of 2004 and came in operation in January 2005. This plant was set up to fulfill the energy needs of Ghazi Fabrics International Ltd.

Plant Capacity:
3MW x 4
= 12 MW
Waste Heat Recovery System:
Waste heat and exhaust gases are recovered and converted into steam which eventually run two Sizing machines, thereby eliminating the cost of furnace oil required for operation of boilers.

Image
Image
Image