Power Generation
Apart from own grid station to cater electricity requirements of all our three units.
(i)Gas plant unit
Project description
Generation
Gas Power Generation unit comprising four GE Jenbacher Engines was set up at the end of 2004 and came in operation in January 2005. This plant was set up to fulfill the energy needs of Ghazi Fabrics International Ltd.
Plant Capacity
3MW x 4
= 12 MW
Waste Heat Recovery System
Waste heat and exhaust gases are recovered and converted into steam which eventually run two Sizing machines, thereby eliminating the cost of furnace oil required for operation of boilers
(ii)HFO Unit
Project description
Generation
Foreseeing the acute shortage of natural gas in the country in year 2015, we decided to add an alternate source of energy for smooth running of our project.
We purchased three MAN furnace oil base engines having capacity of 9.6 MW. Later we also added waste heat boiler.
Plant Capacity
1 x 1.50 MW ( 20/06/2016 )
2 x 4.05 MW
__________
3 = 9.6 MW